Author Topic: Z/28 02D Built during the 4th week of Feburary 1969, Wheel Date?  (Read 16720 times)

dannystarr

  • Hero Member
  • *****
  • Posts: 1745
    • View Profile
Re: Z/28 02D Built during the 4th week of Feburary 1969, Wheel Date?
« Reply #15 on: March 30, 2010, 04:27:50 PM »
Well no wonder my set of 4 are "FW". Maybe I can find someone to purchase mine after getting what I need. Throw them on eBay or the like. And save a couple hundred bucks towards the YH wheels.

dannystarr

  • Hero Member
  • *****
  • Posts: 1745
    • View Profile
Re: Z/28 02D Built during the 4th week of Feburary 1969, Wheel Date?
« Reply #16 on: April 13, 2010, 06:31:01 PM »
Hey JohnZ, I just sent ya an email about some wheels I am looking at. Thought I would see if I could catch ya here, and have ya check your email..Danny

plumL78

  • Member
  • ***
  • Posts: 228
    • View Profile
Re: Z/28 02D Built during the 4th week of Feburary 1969, Wheel Date?
« Reply #17 on: April 14, 2010, 12:41:46 PM »
jan. 28 is a real date for yh's . My 02D had one K 1 9 1 28 left on it when I bought it. The other three were FW's. I know of an orig  02D car that has all four jan. 28 dates

Hans L

  • Member
  • ***
  • Posts: 381
    • View Profile
Re: Z/28 02D Built during the 4th week of Feburary 1969, Wheel Date?
« Reply #18 on: April 29, 2010, 12:05:43 AM »
My 04B Van Nuys builts Z came only with the YH wheel spare.  It has a January date code; K 1 9 1 10.  I've since found 1 other K 1 9 1 10 and two K 1 9 1 28's.   

Since the spare was a January build, I'm assuming January is OK for an April build car, as it appears YH rally wheels were built in batches only a few times per month.
https://www.instagram.com/69camarorsz28/
'69 Camaro RS Z/28 Van Nuys Built
'69 Chevelle SS 396 4 Speed
'70 Camaro SS L78

dannystarr

  • Hero Member
  • *****
  • Posts: 1745
    • View Profile
Re: Z/28 02D Built during the 4th week of Feburary 1969, Wheel Date?
« Reply #19 on: April 29, 2010, 06:02:43 PM »
Hans L, I am not really sure about that much of a stretch, 3 or 4 months seems like a long time. They would have had to have ALOT of wheels laying around still, and hold production while they went thru them all. I don't know, I am just speculating. They of course could not be asked for RIGHT when they were needed, so they had to have some stock laying around, but 1000's??? I think you are correct on the batch building of wheels from what I have learned from the guys on this forum. And I don't think weekly dates are available. Seems like Jan of 69' has 2 build dates, MAYBE 3. That would be 1/10/69 and 1/28/69 as you mentioned. I am still thinking I might want some 1/28/69 wheels, or even from the first batch of Feb. 69' {anybody got any?} as I now have a few 1/10/69, all "YH" of course. Oh well, the mystery continues. Good times Eh?......Danny

 

anything