Author Topic: Shipping Data Report vs Trim Tag  (Read 13307 times)

crobjones2

  • Member
  • ***
  • Posts: 404
    • View Profile
Re: Shipping Data Report vs Trim Tag
« Reply #15 on: November 06, 2014, 02:24:13 AM »
Gary,
That's not correct. Orders were placed sometimes months in advance.
The tag was made for the build, not for the order.

'Months in advance' may be true for larger volume orders, or for dealers orders leading into a new model year, but in cases of a 'customer order' (which receives higher priority for build scheduling), it is generally 2-4 weeks.   I 'special ordered' a handful of cars (Chevrolet and Chrysler) during the early 70's, and the fastest a car came in was 2-3 weeks, and the longest was around 4 weeks prior to the cars' build.   I know from my own engirneering/manufacturing background (not the automobile industry), that when an order was received, it was 'estimated' when the order could be filled (for feedback to the customer).   Since all the other information on the cowl tag (model/options/etc) is KNOWN, or generated (bdy nbr), at the time of order acceptance  I'm curious just exactly how long after order acceptance did it take Chevrolet to provide the information to Fisher and and when did Fisher 'fix' the data that would go on the cowl tag?   I'd think this would happen in a few days to a week at most.

The fact that some cars cowl tag date and actual build date differ significantly suggests that there was sufficient time between the "cowl tag data generation" (that could be well before the cowl tag actually being made) that temporary unforeseen parts shortages etc could affect the time difference.   If the cowl tag data (production week) was generated at the time the car was actually beginning the build, then we should not be seeing the significant difference in the dates as we do.  We've already been informed by JohnZ and others that once the body began the process, hardly nothing affected the build sequence, and the production rate was 'fixed'...

The body tag could remain in queue if a sudden material shortage arose. Our '67 Z/28 project of many years ago had an 06E tag, V0706MO engine-no question it was OE. Car was final-assembled the second week in July. What happened? Who knows. Car had a blue custom interior, all it takes is one missing part to put the order on hold. Material-assuring orders must have been an error-prone manual process in those days.

Don't forget Fisher occasionally punched out tags well in advance. All June '69s are 06A, all July are 07A.




William
Interesting!  Would the part shortage have been on the Fisher or the Chevrolet side?
I am itrigued as my 69 06A - for what it is worth  - has a 0526 built motor and all the engine accessories date to the same time, but the NCRS puts the shipping date as June 18th
Chris
69 SS 350

69Z28-RS

  • Hero Member
  • *****
  • Posts: 5781
  • owner since 4-Apr-1976
    • View Profile
Re: Shipping Data Report vs Trim Tag
« Reply #16 on: November 06, 2014, 02:52:51 AM »
Just guessing here..  Tell me how close I am?   :)
 VINs from ~ 658146 to ~ 658795 came off the line on 18 June 1969.       Does your VIN fall into that range?
09C 69Z28-RS, 72 B 720 cowl console rosewood tint
69 Corvette, '60 Corvette, '72 Corvette
90 ZR1 red/red #246, 90 ZR1 white/gray #2466
72 El Camino, '55-'56-'57 Nomads, '55-'57 B/A Sedan

william

  • CRG Member
  • *****
  • Posts: 3189
    • View Profile
Re: Shipping Data Report vs Trim Tag
« Reply #17 on: November 06, 2014, 04:12:15 AM »
Gary,
That's not correct. Orders were placed sometimes months in advance.
The tag was made for the build, not for the order.

'Months in advance' may be true for larger volume orders, or for dealers orders leading into a new model year, but in cases of a 'customer order' (which receives higher priority for build scheduling), it is generally 2-4 weeks.   I 'special ordered' a handful of cars (Chevrolet and Chrysler) during the early 70's, and the fastest a car came in was 2-3 weeks, and the longest was around 4 weeks prior to the cars' build.   I know from my own engirneering/manufacturing background (not the automobile industry), that when an order was received, it was 'estimated' when the order could be filled (for feedback to the customer).   Since all the other information on the cowl tag (model/options/etc) is KNOWN, or generated (bdy nbr), at the time of order acceptance  I'm curious just exactly how long after order acceptance did it take Chevrolet to provide the information to Fisher and and when did Fisher 'fix' the data that would go on the cowl tag?   I'd think this would happen in a few days to a week at most.

The fact that some cars cowl tag date and actual build date differ significantly suggests that there was sufficient time between the "cowl tag data generation" (that could be well before the cowl tag actually being made) that temporary unforeseen parts shortages etc could affect the time difference.   If the cowl tag data (production week) was generated at the time the car was actually beginning the build, then we should not be seeing the significant difference in the dates as we do.  We've already been informed by JohnZ and others that once the body began the process, hardly nothing affected the build sequence, and the production rate was 'fixed'...

The body tag could remain in queue if a sudden material shortage arose. Our '67 Z/28 project of many years ago had an 06E tag, V0706MO engine-no question it was OE. Car was final-assembled the second week in July. What happened? Who knows. Car had a blue custom interior, all it takes is one missing part to put the order on hold. Material-assuring orders must have been an error-prone manual process in those days.

Don't forget Fisher occasionally punched out tags well in advance. All June '69s are 06A, all July are 07A.




William
Interesting!  Would the part shortage have been on the Fisher or the Chevrolet side?
I am itrigued as my 69 06A - for what it is worth  - has a 0526 built motor and all the engine accessories date to the same time, but the NCRS puts the shipping date as June 18th

Fisher released per Chevy's schedule so in this case it was likely a Fisher shortage. If Chevy had a known shortage they would not schedule the unit.


Learning more and more about less and less...

crobjones2

  • Member
  • ***
  • Posts: 404
    • View Profile
Re: Shipping Data Report vs Trim Tag
« Reply #18 on: November 07, 2014, 03:10:23 AM »
Just guessing here..  Tell me how close I am?   :)
 VINs from ~ 658146 to ~ 658795 came off the line on 18 June 1969.       Does your VIN fall into that range?

Close
based on my original guess I presumed the production completion date to be the week prior- possibly the 13th
based on your numbers, June 16th
Chris
69 SS 350

KurtS

  • CRG Coordinator
  • *****
  • Posts: 5959
    • View Profile
Re: Shipping Data Report vs Trim Tag
« Reply #19 on: November 07, 2014, 03:05:54 PM »
Chris,
Lots of cars built at the same time as yours have the same date of production as yours.
Kurt S
CRG