69 Body numbers equal the order number assigned when theorer was accepted and the car assigned to a factory. They were not necessarily built in the same order as the orders were received, especially Z28s in the november/December of 68 time frame. There was some kind of material shortage that delayed production of alot of cars in that time frame, possibly intake manifolds or rear axles.