Did a search but could not find a lot of information on run dates . One question in particular was brought up but was not answered.
What is the acceptable relation between run dates (week) and body build date (week) ?
I have a 67 05E build with run dates on the R door of H17, L door H18, gas neck cover H15. Looks like the run dates are falling in line but are these dates within the correct range of an 05E build?
Is a 67 05E a week 21 or 22 ?