I spent a couple of months on the phone with them, since they had to schedule testing of the spring I sent them .. and then we spent some time deciding on which of a couple of spring wire sizes to use, since I wanted the spring rates to be as near to factory z28 as possible, and I definitely wanted the easily measureable specs (number of coils, coil diameter, wire size, etc) to be exactly the same, so in my case it took me from November 2012 until mid January to receive the new coils. One member here just contacted them to order the same spring as mine (no testing required) and they gave him a 4-wk lead time (but since he was in middle of a restoration, I don't think he rushed them).
Alternatively you can go online and order an OTS spring and get it within a day or two from almost any parts store, and it may work fine for you, even though the visually checkable things (# of coils,etc) will likely not be the same.